The Problem

I need rails positioned on the line furthest from the access point.

I need to transport 60ft closure rails, transition rails, and IBJ’s that have been delivered to an access point.  The track layout is a multiple track system and I need the rails positioning on the line furthest from the access point.


View Solution
The Solution

If your challenge involves re-railing or rail logistics, the TRT is the machine for the job.

2X TRT’s can be used in tandem to lift and transport rails from an access point across multiple lines under live overhead line equipment.  For longer rails we simple add more TRT’s to support the rails.



Machine Combination

The UK’s no.1 rail handling and rail logistics

We have installed over

2056812

feet of rail safely in 2015
We have installed to date

feet of rail safely in 2016
We have handled over

936000

feet of scrap rail in 2015
We have handled to date

feet of scrap rail in 2016