The Problem

I need rails positioned on the line furthest from the access point.

I need to transport 60ft closure rails, transition rails, and IBJ’s that have been delivered to an access point.  The track layout is a multiple track system and I need the rails positioning on the line furthest from the access point.


View Solution
The Solution

If your challenge involves re-railing or rail logistics, the TRT is the machine for the job.

2X TRT’s can be used in tandem to lift and transport rails from an access point across multiple lines under live overhead line equipment.  For longer rails we simple add more TRT’s to support the rails.



Machine Combination

The UK’s no.1 rail handling and rail logistics